
Add to Cart
Fully automatic Servo Motor Injection Molding Machine 100Ton
Parameter:
| GS98HS | ||||
A | B | C | |||
INJECTIONUNIT | Screw Diameter | mm | 32 | 36 | 40 |
Screw L/D Ratio | L/D | 22.5 | 20 | 18 | |
Shot size(Theoretical) | cm3 | 139 | 176 | 217 | |
PS) Injection Weight | g | 121 | 160 | 198 | |
PS Injection Rate | g/s | 79 | 100 | 123 | |
PS Plasticizing capacity | g/s | 10 | 15 | 19 | |
Injection Pressure | Mpa | 190 | 150 | 122 | |
Screw Speed | Rpm | 0-200 | |||
CLAMPINGUNIT | Clamp Tonnage | KN | 980 | ||
Toggle stroke | mm | 320 | |||
Space Between Tie Bars | mm | 360*360 | |||
Max.Mold Height | mm | 380 | |||
Min.Mold height | mm | 130 | |||
Ejector stroke | mm | 100 | |||
Ejector tonnage | KN | 33 | |||
Ejector Number | piece | 5 | |||
OTHERS | Max.Pump Pressure | Mpa | 16 | ||
pump motor power | KW | 11 | |||
Heater Power | KW | 6.5 | |||
Machine Dimension(L*W*H) | m | 4.05*1.20*1.81 | |||
Machine Weight | t | 3.5 | |||
PS Hopper Capacity | Kg | 25 | |||
Oil Tank Capacity | L | 120 |
Advantages:
1. Energy-saving:
Super low energy consumption, saving energy about 30% as compared to load sensitive variable pump, and about up to 80% as compared to constant flow pump, and its energy saving effect is comparable to the fully electric forming machine.
2. Low noise
Reduce greatly the noise produced by pressure control operation.
3. Reducing cost for long term
Realize energy saving and reduce running cost. Compared to electric type, the initial investment and maintenance cost is reduced greatly.
4. Easy operation
Parameters setting and system speed adjustment are very simple digital operations. The customer only needs to operate the control panel just like common machine.
5. High performance
High response (30ms-130ms), high stability, accurate repeatability and energy saving.
FAQ:
1) How can I place order?
A: You can contact us by email about your order details, or place order on line.
2) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T (HSBC bank) and Paypal, Western Union are the most usual ways we are using.
3) What’s the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do pr -epaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 7-15days if we don’t have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
4) How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.
5) How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure.